LTM tenders of Bagerhat district. |
OSTETM tenders of Bagerhat zilla. |
OTM tenders of Bagerhat. |
View All the active tenders of Bagerhat district.
eGP Tender ID: 1001218; Works (NCT)
APP ID: 197056;
District: Bagerhat
Reference No.: 42.01.0100.617.44.001.24-2058; 27-06-2024
Package Title: Re-excavation of Kundola Regulator Branch Khal from km 0.000 to km 0.450 = 0.450 km in Sultanpur, Gotapara Union, Bagerhat Sadar Upazila in Nazirpur Sub-project under Bagerhat O&M Division, BWDB, Bagerhat under O&M Budget during the FY 2023-24.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Bagerhat O&M Division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2024-06-27 18:00:00
Document last selling: 2024-07-14 16:00:00
Closing / Opening: 2024-07-15 13:00:00
Brief Description of Package: Bag/Rev/OTM/Khal/W-23/2023-24
Re-excavation of Kundola Regulator Branch Khal from km 0.000 to km 0.450 = 0.450 km in Sultanpur, Gotapara Union, Bagerhat Sadar Upazila in Nazirpur Sub-project under Bagerhat O&M Division, BWDB, Bagerhat under O&M Budget during the FY 2023-24.
Tender Document Price: Tk. 1000;
Tender Security: 32000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 1000, estimated cost should be less than or equal 50 lacs BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 1066666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 3200000 BDT.
Thus, Official Cost Estimate should be BDT. 1066666 ~ 3200000.
Eligibility criteria:
1. All the tenderers must be registered with the e-GP portal through CPTU.
2. The tenderer should meet all of the criteria outlined in the TDS.
3. Tenderers should submit their credit line facility/liquid assets certificate according to the attached format (Form PW2a-3). The credit line facility certificate format is attached in Section 7 of TDS. Without a credit line facility/liquid assets certificate according to the attached format, the tenderer may be declared non-responsive.
4. The quoted amount of the tender beyond 10% above or below the official estimated cost will be non-responsive.
5. Payments for executed work will be made upon the availability of funds. Any claim for the late payments will not be entertained. The quality and quantity of work shall be checked by the BWDB Task Force Committee.
6. The contractor shall keep records of still and video pictures of the works before and after the completion of the works, at his own expense, maintaining the same angle of pictures.
7. After completion of the tender opening process, if the authority is unable to download important documents from the tender that are considered for tender evaluation, the tenderer may be treated as non-responsive.
Executive Engineer
Bagerhat O&M Division
BWDB, Bagerhat.
Location of work / delivery: Sultanpur, Bagerhat
Budget Type: Revenue
Category: Construction work for water projects; Works for complete or part construction and civil engineering work;
PE Address: Bagerhat, City: Bagerhat, Thana: Bagerhat Sadar, District: Bagerhat - 9300, Country: Bangladesh,
See more tenders from
Bagerhat O&M Division; Bangladesh Water Development Board (BWDB):
1053745 : K-06/2022-23
River Bank Protective Work from km 2.500 to km 3.000 = 0.500 km at Khawlia Bazar Area along the Right Bank of Panguchi River in C/W "Protection of Morrelganj Upazila sadar & Adjacent Areas from Erosion of panguchi River & Re-excavation/Dredging of Bishkhali River in Bagerhat District " Under Bagerhat O&M Division,BWDB, Bagerhat. (Package No.- K-06/2022-23)
1053744 : S-01/2022-23
River Bank Protective Work from km 2.100 to km 2.600 = 0.500 km at Sinnikhali Area along the Left Bank of Panguchi River in C/W "Protection of Morrelganj Upazila sadar & Adjacent Areas from Erosion of panguchi River & Re-excavation/Dredging of Bishkhali River in Bagerhat District " Under Bagerhat O&M Division,BWDB, Bagerhat. (Package No.- S-01/2022-23)
1028893 : S-01/2022-23
River Bank Protective Work from km 2.100 to km 2.600 = 0.500 km at Sinnikhali Area along the Left Bank of Panguchi River in C/W "Protection of Morrelganj Upazila sadar & Adjacent Areas from Erosion of panguchi River & Re-excavation/Dredging of Bishkhali River in Bagerhat District " Under Bagerhat O&M Division,BWDB, Bagerhat. (Package No.- S-01/2022-23)
1028892 : M-2/2022-23
River Bank Protective Work from km 0.921 to km 1.036 & km 1.446 to km 1.656 = 0.325 km at Morrelgonj Ferry Ghat Area along the Right Bank of Panguchi River in C/W "Protection of Morrelganj Upazila sadar & Adjacent Areas from Erosion of panguchi River & Re-excavation/Dredging of Bishkhali River in Bagerhat District " Under Bagerhat O&M Division,BWDB, Bagerhat. (Package No. - M-02/2022-23)
1028891 : S-02/2022-23
River Bank Protective Work from km 2.600 to km 3.100 = 0.500 km at Sinnikhali Area along the Left Bank of Panguchi River in C/W "Protection of Morrelganj Upazila sadar & Adjacent Areas from Erosion of panguchi River & Re-excavation/Dredging of Bishkhali River in Bagerhat District " Under Bagerhat O&M Division,BWDB, Bagerhat. (Package No.- S-02/2022-23)
1019054 : S-03/2022-23
River Bank Protective Work from km 3.100 to km 3.600 = 0.500 km at Sinnikhali Area along the Left Bank of Panguchi River in C/W "Protection of Morrelganj Upazila sadar & Adjacent Areas from Erosion of panguchi River & Re-excavation/Dredging of Bishkhali River in Bagerhat District " Under Bagerhat O&M Division,BWDB, Bagerhat. (Package No.- S-03/2022-23)