Login |Register

LTM tenders of Cumilla district. | OSTETM tenders of Cumilla zilla. | OTM tenders of Cumilla. | View All the active tenders of Cumilla district.

eGP Tender ID: 1018778; Works (NCT)
APP ID: 205062; District: Cumilla
Reference No.: OTM e-GP Tender Notice # 01/2024-25 (IDFPC)
Package Title: Drain-01) Construction of RCC Drainfrom Nasratpur Bypass Road to Fishaari Road Via Mohammad Ullah House (L= 260.00m) in ward No- 01 under Laksam Pourashava, Cumilla.
Organization: Local Government Engineering Department (LGED)
Procuring Entity: PIU Office of Laksam Pourashava, Cumilla
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2024-09-26 11:00:00
Document last selling: 2024-10-23 16:00:00
Closing / Opening: 2024-10-24 14:00:00
Brief Description of Package: IDFPC/LAK/Drain/2023-24/DR-02
Drain-01) Construction of RCC Drainfrom Nasratpur Bypass Road to Fishaari Road Via Mohammad Ullah House (L= 260.00m) in ward No- 01 under Laksam Pourashava, Cumilla. Drain-02) Construction of RCC Drain from Kundra New Masjid to Digirpar Road Via Kazi Bari (L= 322.00m) in ward no 02 under Laksam Pourashava, Cumilla. Drain-03) Construction of RCC Drain from Mamotaj House to Ali Akkas House Road (L=75.00m) in ward no 04 under Laksam Pourashava, Cumilla. Drain-04) Construction of RCC Drain From Poschimgaon Shahapara Road to North Laksam Kndirpar Road via Rajghat Housing L=250.00m in ward no 05 under Laksam Pourashava,Cumilla.
Tender Document Price: Tk. 2000; Tender Security: 450000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 2000, estimated cost should be more than 50 lacs BDT, but less than or equal 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 15000000.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 45000000 BDT.
Thus, Official Cost Estimate should be BDT. 15000000 ~ 20000000.

Eligibility criteria:
As Per Tender Data sheet (TDS)
Project: Infrastructure Development of five pourashava under Cumilla District.
Location of work / delivery: Laksam Pourashava, Cumilla
Budget Type: Development
Category: Engineering works and construction works; Works for complete or part construction and civil engineering work;
PE Address: Pourashava: Laksam, District: Cumilla, City: Laksam, Thana: Laksham, District: Cumilla - 3570, Country: Bangladesh,


See more tenders from PIU Office of Laksam Pourashava, Cumilla; Local Government Engineering Department (LGED):
1056992 : IDFPC/LAK/Road/2023-24/Rd-02 Environmental Mitigation Works. Road-1) Construction of RCC Road from Laksam Girls High School Gate to Mamotaj House Via Jalal House (0-180m) in ward no 04. Road-2) Re-Construction & construction of Uni Block Road from (a) Laksam-Noakhali RHD Road at Voskapolia to Laksam-Noakhali RHD Road Via Water Treatment Plant & Agamon Food Park (0-578m), (b) Laksam Noakhali RHD Road to Abul Hossain Professor House (0-76m) in word no 01. Road-3) Re-Construction of Uni Block Road from Kundra New Mosjid to Digir Par Road Via Kazi Bari (0-370m & Link 21m) at word no 02. Road-4) Construction of Uni Block Road from Gopalpur BC Road near Shahadat Shop Via Bhuiya Bari to Masum Vendor House (0-380m) and Link Road=70m in ward No- 03, Road-5) Construcion of Uni Block Road from Laksam Girls High School Road to Ali Akkas House Road (0-103m) in ward no 04. Road-6) Construction of Uni Block Road From Poschimgaon Saha Para Road to North Laksam Kndirpar Road via Rajghat Housing (0-228m) and Link1=70m, Link2=24m in ward no 05. Road-7) Construction of Uni Block Road from (a) Nawbab Fouzunesa College Road to Abul Kalam Azad House Via Councilor bari (0-80m), (b) Batakhali Pucca Road to Noru Mia Shop Via Soruj Commissioner (0-180m) With Link Road=25m, (c) Batakhali College road Robel House to Billal House (0-90m), (d) Kandir par Salehpur BC road (Kochiyamura) to Azaharul Haque House (0-100m) in ward no 06. Road-8) Re-Construction & Construction of Uni Block Road from (a) In front of Gazimura Primary School Road to Laksam-Munshirhat Road Via Moddhapara Mosque (0-600m) and (b) Gazimura Mojomder Bari to Malek Khalifa house (0-90m) in word no-07. Box Culvert-1 & Road-9) Part- A & Part-B: Single Vent Box Culvert RCC Road , Re-Construction work of Road by RCC from Laksam-Chuddagram Road to Laksam-Nangolkot Road Via Vozpara Mosjid (0-1169m), Including 01 no. Single Vent Box Culvert (5.0m*5.0m) at Vozpara in ward no 09.under Laksam Pourashava, Cumilla.
1056991 : IDLPC/LAK/ROAD/2023-24/W-03 Environmental & Mitigation Works. 1. Re-Construction Work of Road by Uni-block Nowakhali Rail Gate Manik Mia Shop to Atiti Bazar Road (Ch.00-443.00m) Link Mukles Mia House 55.00m at Ward No -04 under Laksam Pourashava, 2. Improvement of Uttar Laksam Housing, Housing Mosjid to Baccho Mia House (Ch.00-90.00), Link-1 Mosjid Road to Tiles Showroom(Ch.00-138.00), Link-2 Mosjid Road to By-Pass Road Via Mir Hossain House(Ch.00-205.00), Link-3 Mosjid Road to Mostafiz Chairman(Ch.00-90.00), Link-4 Jonony Parcel RCC Road to Chouddagram Road (Ch.00-347.00m), at Uttar Laksam Housing Ward No-04 under Laksam Pourashava, 3. Construction Work of Road by Uni-block from Rajghat Bridge to Dopha Bari Via Bapary bari (Ch.00-178.00m) at Rajghat Ward No-05 under Laksam Pourashava, 4. Construction Work of Road by RCC from Rajghat Moyder Mill to Kazi Para Pucca Road (Ch.301.00m), at Rajghat Ward No-05 under Laksam Pourashava, 5. Construction Work of Road by Uni-block from Utter Pascimgaon Poura Primary School to Modafforgonj Road Via Mazar bari (Ch.00-445.00m) & Link Chadpur Rail Line 120.00m at Utter Pascimgaon Ward No-05 under Laksam Pourashava, 6. Re-construction Work of Road by Uni-block from Daroga Bangla Bai House to Shovas Bhaumik House Via Nawab Faizunnesa Sorkary Pokor (Ch.00-580.00) & RCC Retaining wall 35.00m, Palisading 42.00m at Gazimuri Ward No-06 under Laksam Pourashava, 7. Construction Work of Road by Uni-block from Upzilla Porishad Narsary Road to Robiul House via Sali House (Ch.00-64.00m) at Ward No-06 under Laksam Pourashava, 8. Construction Work of Road by Uni-block from Batakhali Pascim Para Ali Ahmad Mawlanar Shop to Masod Mia House (Ch.00-145.00m) & RCC Retaining wall 60.00m at Batakhali Ward No-06 under Laksam Pourashava, 9. Re-Construction Work of Road by Uni-block Pascimgaon Nawab Faizunnesa College Gate to College Para RCC Road (Ch.00-440.00m) & RCC Retaining wall 60.00m at Batakhali Ward No-06 under Laksam Pourashava, Dist.Cumilla.
1040073 : IUIDP-2/LAK/P-31. 1 Improvement of Road By Dense Carpeting (DC) from Approach Road Chandpur Rail Gate at RHD to Laksam Mudaffargonj Road (Ch.0.00-760.00m) at Ward No-04 & 06 Under Laksam Pourashava, District : Cumilla. 2 Construction of RCC Retaining Wall from Approach Road Chandpur Rail Gate at RHD to Laksam Mudaffargonj Road (Ch.0.00-760.00m) at Ward No-04 & 06 Under Laksam Pourashava, District : Cumilla. 3 Construction of Lighting from Approach Road Chandpur Rail Gate at RHD to Laksam Mudaffargonj Road at Ward No-04 & 06 Under Laksam Pourashava, District : Cumilla. 4 Construction of RCC U-Drain from Approach Road Chandpur Rail Gate at RHD to Laksam Mudaffargonj Road (Ch.0.00-720.00m) at Ward No-04 Under Laksam Pourashava, District : Cumilla.
1040072 : IUIDP-2/LAK/P-30. 1 Construction of RCC U-Drain From Minister Chattar to Alamin Institute Gate (Ch 0.00-270.00m) at Ward No-04 & 06 Under Laksam Pourashava, District : Cumilla. 2 Construction of Double Bend Box Culvert From Minister Chattar to Alamin Institute Gate (5.00m X 5.00m) at Ward No-04 & 06 Under Laksam Pourashava, District : Cumilla. 3 Construction of Lighting From Minister Chattar to Alamin Institute Gate (Ch 0.00-470.00m) at Ward No-04 & 06 Under Laksam Pourashava, District :Cumilla. 4 Construction of RCC Retaining Wall From Minister Chattar to Alamin Institute Gate (Ch 0.00-270.00m) at Ward No-04 & 06 Under Laksam Pourashava, District : Cumilla.
1018777 : IDFPC/LAK/Road/2023-24/Rd-02 Environmental Mitigation Works. Road-1) Construction of RCC Road from Laksam Girls High School Gate to Mamotaj House Via Jalal House (0-180m) in ward no 04. Road-2) Re-Construction & construction of Uni Block Road from (a) Laksam-Noakhali RHD Road at Voskapolia to Laksam-Noakhali RHD Road Via Water Treatment Plant & Agamon Food Park (0-578m), (b) Laksam Noakhali RHD Road to Abul Hossain Professor House (0-76m) in word no 01. Road-3) Re-Construction of Uni Block Road from Kundra New Mosjid to Digir Par Road Via Kazi Bari (0-370m & Link 21m) at word no 02. Road-4) Construction of Uni Block Road from Gopalpur BC Road near Shahadat Shop Via Bhuiya Bari to Masum Vendor House (0-380m) and Link Road=70m in ward No- 03, Road-5) Construcion of Uni Block Road from Laksam Girls High School Road to Ali Akkas House Road (0-103m) in ward no 04. Road-6) Construction of Uni Block Road From Poschimgaon Saha Para Road to North Laksam Kndirpar Road via Rajghat Housing (0-228m) and Link1=70m, Link2=24m in ward no 05. Road-7) Construction of Uni Block Road from (a) Nawbab Fouzunesa College Road to Abul Kalam Azad House Via Councilor bari (0-80m), (b) Batakhali Pucca Road to Noru Mia Shop Via Soruj Commissioner (0-180m) With Link Road=25m, (c) Batakhali College road Robel House to Billal House (0-90m), (d) Kandir par Salehpur BC road (Kochiyamura) to Azaharul Haque House (0-100m) in ward no 06. Road-8) Re-Construction & Construction of Uni Block Road from (a) In front of Gazimura Primary School Road to Laksam-Munshirhat Road Via Moddhapara Mosque (0-600m) and (b) Gazimura Mojomder Bari to Malek Khalifa house (0-90m) in word no-07. Box Culvert-1 & Road-9) Part- A & Part-B: Single Vent Box Culvert RCC Road , Re-Construction work of Road by RCC from Laksam-Chuddagram Road to Laksam-Nangolkot Road Via Vozpara Mosjid (0-1169m), Including 01 no. Single Vent Box Culvert (5.0m*5.0m) at Vozpara in ward no 09.under Laksam Pourashava, Cumilla.
Share on Twitter