eGP Tender ID: 1025548; Works (NCT)
APP ID: 189028; District: Satkhira
Reference No.: T-3/796 Date: 31/10/24
Package Title: River bank protection work from km 3.275 to km 3.710=435.00 meter in polder No-14/1 under Rehabilitation of polder No-14/1 in khulna District under Satkhira O&M Division-2, BWDB, Satkhira.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Satkhira O&M Division-2
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2024-11-03 09:00:00
Document last selling: 2024-11-25 15:30:00
Closing / Opening: 2024-11-25 16:30:00
Brief Description of Package: River bank protection work from km 3.275 to km 3.710 = 435.00 meter in polder No-14/1 under Rehabilitation of polder No-14/1 in khulna District under Satkhira O&M Division-2, BWDB, Satkhira. (Package No: Sat-2/08).
Tender Document Price: Tk. 4000; Tender Security: 6800000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 226666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 680000000 BDT.
Thus, Official Cost Estimate should be BDT. 226666666 ~ 680000000.

Eligibility criteria:
1. Payment of work will be made on the availability of budget & fund.
2. If any type of Structures/Obstacles is needed to dismantle to execute the work as per Design & Specification, the selected Contractor will do this at his own cost & arrangement. No Extra claim will be entertained in this regard.
3. Representative still picture & video of prework & postwork of the same location will be taken by contractor and submit to Procuring entity at contractor's own cost.
4. Quantity of work may increase or decrease.
5. Design may also be changed or modified (if required).
6. Prework & Postwork may be also taken by taskforce or other agency or jointly as per instruction of Higher Authority or PE.
7. After completion of the whole work final Measurement will be Taken. The final bill will be paid based on the final measurement.
8. Contract will be terminated if contractor's personnel is involved in any kind of unauthorized/illegal financial transaction from the locals during work.
9. Work order/NOA will be issued depending on project time extension approval from the competent authority. 
"A misrepresentation or omission regarding the value of existing commitments and ongoing works by a tenderer in the E-GP system constitutes a fraudulent practice under ITT clause Corrupt, Fraudulent, Collusive, Coercive or Obstructive practices. In that case, the tenderer will be non-responsive, and further action may be taken in accordance with PPR 127 and ITT Clause Corrupt, Fraudulent, Collusive, Coercive or Obstructive Practices." as per circular of CPC, BWDB, vide (Memo No- 42.01.0000.005.22.002.18.96), Dated:11-09-2024.(Copy Attached in Particular Condition of Contract)
Project: Rehabilitation of Polder no.14/1 in Khulna District
Location of work / delivery: Koyra, Khulna
Budget Type: Development
Category: Construction work for water projects; Works for complete or part construction and civil engineering work;
PE Address: Itagachha, Satkhira, City: Satkhira, Thana: Satkhira Sadar, District: Satkhira - 9400, Country: Bangladesh,


See more tenders from Satkhira O&M Division-2; Bangladesh Water Development Board (BWDB):
1025550 : Sat-2/38 Repair of protection work from Km. 0.350 to km 0.720 = 370.00 m & from Km. 0.885 to km 1.125 = 240.00 m total = 610.00m in Polder No-14/1 under "Rehabilitation of Polder No-14/1 in Khulna District" under Satkhira O&M Division-2, BWDB, Satkhira.
1025549 : Sat-2/09 River bank protection work from km 3.710 to km 4.145=435.00 meter in polder No-14/1 under Rehabilitation of polder No-14/1 in khulna District under Satkhira O&M Division-2, BWDB, Satkhira.
1025547 : Sat-2/06 River bank protection work from km 1.125 to km 1.575=450.00 meter in polder No-14/1 under Rehabilitation of polder No-14/1 in khulna District under Satkhira O&M Division-2, BWDB, Satkhira.
976772 : W-Sat-2/53 Re-Excavation of Morichap River from km. 29.365 to km. 30.500 = 1135 meter in Polder No-2 at Assasuni Upazilla in c/w "Drainage Improvement of Polder No. 1, 2, 6-8 & 6-8 (Ext.) in Satkhira District" Under Satkhira O&M Division-2, BWDB, Satkhira during the FY 2023-2024.
See live tender notices for river bank protection.
Share on Twitter