LTM tenders of Sherpur district. |
OSTETM tenders of Sherpur zilla. |
OTM tenders of Sherpur. |
View All the active tenders of Sherpur district.
eGP Tender ID: 1057889; Works (NCT)
APP ID: 204169;
District: Sherpur
Reference No.: T-02/299, Dated: 01-01-2025
Package Title: Repair of Executive Engineer's Tinshed Office Building of Sherpur WD Division, BWDB Sherpur to execute official works under O&M Budget Under Sherpur WD Division, BWDB, Sherpur during the FY 2024-2025.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Sherpur WD Division, BWDB
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2025-01-01 17:00:00
Document last selling: 2025-01-15 15:00:00
Closing / Opening: 2025-01-15 17:00:00
Brief Description of Package: Repair of Executive Engineer's Tinshed Office Building of Sherpur WD Division, BWDB Sherpur to execute official works under O&M Budget Under Sherpur WD Division, BWDB, Sherpur during the FY 2024-2025.
Tender Document Price: Tk. 1000;
Tender Security: 14000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 1000, estimated cost should be less than or equal 50 lacs BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 466666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 1400000 BDT.
Thus, Official Cost Estimate should be BDT. 466666 ~ 1400000.
Eligibility criteria:
1. Only e-GP registered Tenderer/Firms can participate to the Tender.
2. All individual(s)/firms(s)/ who fulfill the qualification(s) criteria as stipulated in the Tender Data Sheet (TDS) except the firm that has been determined to be ineligible by BWDB or any other Government organization.
3. All conditions apply as per Tender Document.
4. Tender Security shall be submitted in the form of DD/BD/Pay Order (MICR)/Bank
Guarantee in favor of Accounts Officer, Regional Accounting Center (RAC), BWDB,
Mymensingh.
Special Instructions:
(a) Payment shall be made subject to budget allocation & availability of fund but the work must be continued and proportionate progress must be achieved.
(b) Work certificate which is issued by the PE (Procuring Entity) and executed by the public fund will only be considered as a qualification criteria.
(c) The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of the work order with decreased quantity of the work.
(d) The tenderer will visit and examine the site with his own responsibility and expenses and obtain all information that may be necessary for preparing the tender and entering into a contract contract for performance of the works.
(e) Latest govt. circular on procurement of works will be applicable.
(f) The tenderer has to arrange land or other establishment by his own for execution of work. Test fee for the required test (as per direction of engineer in charge) conducted during/after the work to be paid by the contractor.
(g) Before and after the execution of work videos and picture have to be taken by the contractor of his own cost and submitted to the PE which represents the actual situation of work.
(h) Taskforce measurement report, uploaded BWDB specification and taskforce guideline must be followed by the contractor.<
Location of work / delivery: Sherpur Sadar-Sherpur
Budget Type: Revenue
Category: Building construction work; Works for complete or part construction and civil engineering work; Other building completion work;
PE Address: BWDB, Madhabpur, Sherpur Sadar, City: Sherpur Sadar, Thana: Sherpur Sadar, District: Sherpur - 2100, Country: Bangladesh,
See more tenders from
Notice: Undefined index: PEID in /home/dorpatra/public_html/getEGPNotice.php on line 197
Sherpur WD Division, BWDB; Bangladesh Water Development Board (BWDB):
1057888 : NDR-Sherpur/W-06/2024-25
Construction of Executive Engineer's Tinshed Office Building (2 rooms) of Sherpur WD Division, BWDB Sherpur to execute official works under O&M Budget, under Sherpur WD Division, BWDB, Sherpur during the FY 2024-2025.
1057887 : NDR-Sherpur/W-05/2024-25
Repair of Embankment along the L/B of Moharoshi river in between km 5.00 to km 12.00 =2160.00 m at Jhenaigati upazila, district-Sherpur under Sherpur WD Division, BWDB, Sherpur during the FY 2024-25.
(Precautionary protective work from km. 5.950 to 6.050 = 100.0 m , 7.100 to 7.300 = 200.00 m Total = 300.00 m & re-sectioning work from km. 7.500 to 8.730 = 1230.00 m, 8.830 to 8.900 = 70.00 m, 8.930 to 9.120 = 190.00 m, 9.210 to 9.550 = 340.00, 11.600 to 11.630=30.00 m Total = 1860.00 m,Grand Total=2160.00 m).
1057886 : NDR-Sherpur/W-04/2024-25
Repair of Embankment along the R/B of Moharoshi river in between km 6.00 to km 10.00 = 1340.00 m at Jhenaigati upazila , district-Sherpur under Sherpur WD Division, BWDB, Sherpur during the FY 2024-25.
(Precautionary protective work from km. 6.060 to 6.110 = 50.00m, 6.780.00 to 6.940 = 160.00m, 8.160 to 8.240 = 80.00 m Total = 290.00m) & re-sectioning work from km. 4.920 to 5.020 = 100.00m, 8.350 to 8.810 = 460.00m, 9.250 to 9.530 = 280.00m, 9.630 to 9.840 = 210.00 m Total = 1050.00m, Grand Total = 1340.00m).
1057885 : NDR-Sherpur/W-03/2024-25
Repair of Embankment along the L/B of Chellakhali River in between km.14.650 to km.19.000 = 975.00 m at Nalitabari Upazila, District-Sherpur, under Sherpur WD Division, BWDB, Sherpur during the FY 2024-25.
(Precautionary protective work from km. 14.650 to 14.900 = 250.00m, 17.030 to 17.105 = 75.00m, 17.590 to 17.670 = 80.00m, Total = 405.00m & re-sectioning work from km. 15.560 to 15.760 = 200.00m, 16.890 to 17.00 = 110.00m, 17.330 to 17.590 = 260.00m Total = 570.00m, Grand Total = 975.00m).
1057884 : NDR-Sherpur/W-02/2024-25
Repair of Embankment along the R/B of Chellakhali River in between km.14.580 to km.19.000 = 1190.00 m at Nalitabari Upazila, District-Sherpur, under Sherpur WD Division, BWDB, Sherpur during the FY 2024-25.
(Precautionary protective work from km. 14.900 to 14.980 = 80.00m, 15.300 to 15.380 = 80.00m, 16.280 to 16.360 = 80.00m, 17.000 to 17.080 = 80.00m Total = 320.00m & re-sectioning work from km.15.750 to 15.850 = 100.00m, 15.990 to 16.280 = 290.00m, 16.480 to 16.680 = 200.00m, 17.120 to 17.400 = 280.00m Total = 870.00m,Grand Total = 1190.00m).