Login |Register

LTM tenders of Gopalganj district. | OSTETM tenders of Gopalganj zilla. | OTM tenders of Gopalganj. | View All the active tenders of Gopalganj district.

eGP Tender ID: 1059613; Works (NCT)
APP ID: 207311; District: Gopalganj
Reference No.: 42.01.3500.474.14.005.24-869; Date: 07/01/2025
Package Title: Temporary closing (ring bundh) of different khals in Tungipara Upazila during eri paddy season (dry period) under Gopalganj WD Division, BWDB, Gopalganj during the year 2024-2025.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Gopalganj WD Division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2025-01-08 12:00:00
Document last selling: 2025-01-22 12:00:00
Closing / Opening: 2025-01-22 16:00:00
Brief Description of Package: Temporary closing (ring bundh) of different khals in Tungipara Upazila during eri paddy season (dry period) under Gopalganj WD Division, BWDB, Gopalganj during the year 2024-2025.
Tender Document Price: Tk. 1000; Tender Security: 45000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 1000, estimated cost should be less than or equal 50 lacs BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 1500000.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 4500000 BDT.
Thus, Official Cost Estimate should be BDT. 1500000 ~ 4500000.

Eligibility criteria:
 
a) Contractors who are registered on e-GP web-portal and fulfill the qualification criteria stated in the tender document.
b) Any individual (s) firm who fulfill the qualifications of the criteria stipulated in the tender data sheet (TDS) and other conditions of the Tender Document for Open Tendering Method (OTM).
c) If the quoted amount by tenderer more than the 10% above or less than the 10% below than the official estimated cost, the submitted tender will be treated as non-responsive.
d) The Provisions laid down in the "Public Procurement Regulation 2008 "(Ammended-2009) for procurement of works will be binding upon the contractors.
e) The work may be totally dropped, Quantity may be increased or decreased; No claim or extra rate will be entertained against cancellation of the tender or issuance of work order with decreased quantity of work.
f) Payment will be made subject to the availability of fund. No claim for extra payment will be entertained for delay of payment.
g) In consideration of public importance, tender has been invited but work orders will be issued subject to approval
h) Authority can cancel the tender any time.
Location of work / delivery: Tungipara, Gopalganj
Budget Type: Revenue
Category: Works for complete or part construction and civil engineering work; Construction work; Hire of construction and civil engineering machinery and equipment with operator; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: Gopalganj, City: Gopalganj, Thana: Gopalganj Sadar, District: Gopalganj - 8100, Country: Bangladesh,


See more tenders from Gopalganj WD Division; Bangladesh Water Development Board (BWDB):
1059850 : GOP/NDR/T/W-09/2024-2025 Precautionary work along right bank of Bagiarkul River from KM. 29.310 to KM. 29.350 = 40.00 m. at Gozalia in Tungipara Upazila under Gopalganj WD Division, BWDB, Gopalganj during the FY 2024-2025. "
1059849 : GOP/NDR/T/W-07/2024-2025 "Precautionary work along left bank of Bagiarkul River (Polder no-04) from KM. 24.890 to KM. 24.930 = 40.00 m. at-Zwinti, Union-Borni, Upazila-Tungipara, Dist-Gopalganj under Gopalganj WD Division, BWDB, Gopalganj during the FY 2024-2025. "
1059848 : GOP/NDR/SD/W-03/2024-2025 Construction of boundary wall at Haridaspur Office Compound & Gauge Station under Gopalganj WD Division, BWDB, Gopalganj during the year 2024-2025.
1059619 : GOP/NDR/T/W-10/2024-2025 "Temporary closing of khals in Kotalipara Upazila during Iri season (dry period) under Gopalganj WD Division, BWDB, Gopalganj during the year 2024-2025. "
1059618 : GOP/NDR/T/W-08/2024-2025 "Supply Work of 175 kg. Geo bags to deal with emergencies during monsoons under Gopalganj WD Division, BWDB, Gopalganj during the FY 2024- 2025. "
1059617 : GOP/NDR/SD/W-04/2024-2025 Extension of walkway and installation of fencing around Sindiaghat Banglow under Gopalganj WD Division, BWDB, Gopalganj during the year 2024-2025.
Share on Twitter