Login |Register

LTM tenders of Chapai Nawabganj district. | OSTETM tenders of Chapai Nawabganj zilla. | OTM tenders of Chapai Nawabganj. | View All the active tenders of Chapai Nawabganj district.

eGP Tender ID: 609674; Works (NCT)
APP ID: 175228; District: Chapai Nawabganj
Package Title: Rehabilitation of Gomostapur HQ - Borgachi GC via Nawrosia (St. Boalia H.S) Road from Ch. 00m-5220m Road ID 170372008 under Gomostapur Upazila . Dist : Chapainawabgonj
Organization: Local Government Engineering Department (LGED)
Procuring Entity: Office of the Executive Engineer, LGED, Chapainawabganj
Procurement Method: One stage Two Envelopes Tendering Method
IFT Published on: 2021-09-21 20:00:00
Document last selling: 2021-10-20 16:00:00
Closing / Opening: 2021-10-21 11:00:00
Brief Description of Package: e-Tender/LGED/CNG/GOBM/201-22/W-35
Rehabilitation of Gomostapur HQ - Borgachi GC via Nawrosia (St. Boalia H.S) Road from Ch. 00m-5220m Road ID 170372008 under Gomostapur Upazila . Dist : Chapainawabgonj
Tender Document Price: Tk. 4000; Tender Security: 620000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 20666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 62000000 BDT.
Thus, Official Cost Estimate should be BDT. 20666666 ~ 62000000.

Eligibility criteria:
As per Tender
Location of work / delivery: Chapainawabgonj
Budget Type: Revenue
Category: Engineering works and construction works; Works for complete or part construction and civil engineering work;
PE Address: XEN Office, LGED, Chapainawabganj, City: Chapainawabganj, Thana: Chapainawabganj Sadar, District: Chapai Nawabganj - 6300, Country: Bangladesh,


See more tenders from Office of the Executive Engineer, LGED, Chapainawabganj; Local Government Engineering Department (LGED):
1055420 : SSSWRDP/Cha/WD-62/2024-25 (Part-A): Construction of Siphon-2 (0.80mx1.5mx13.70m) at ch.1+634m of Main Canal, (Part-B): Construction of Siphon-3 (0.80mx1.5mx12.50m) at ch.2+0554m of Main Canal, (Part-C): Construction of Siphon-4 (0.80mx1.5mx13.70m) at ch.2+287m of Main Canal, (Part-D): Estimate for RCC Cover Slab Main canal (ch 0.00+040km to 0.00+160km =120m=B2=B3) of Moheshpur CAD Sub-project (SP ID-62035) under Shibgonj Upazila, District : Chapai Nawabganj.
1038136 : SSSWRDP/Cha/WD-348/2024-25 Estimate for Laying of 1-500mm dia Upvc Buried Pipe Main Line from Shorif Ghosh House/ Baromaiakhari to Bagmara Pond (B5-B6) at ch. 400m - 1710m = 1310m of Chapai Grameen CAD (SP ID-25289) Sub-Project Under Sadar Upazila, District: Chapai Nawabganj.
1033207 : SSSWRDP/Cha/WD-347/2024-25 (Part-A): Estimate for Laying of 1-315mm dia Upvc Buried Pipe Main Line from Aqueduct to Joka Land (Pl-P2) 450m, Mohishpara to Soto Chandibeel (P3-P4) 120m, Nurul Islam Mango Garden to Sirotoal Village Bhola Hazi Land (P5-P6) 500m & Karaitala to Abu Taher Land (P7-P8) 550m Total Length 1620m. (Part-B): Estimate for Laying of 1-355mm dia Upvc Buried Pipe Line from Hazarashi to Tanurbari ch.0.00m to 570m (P9-P10). (Part-C): Estimate for Construction of RCC Pumping Platform, Ramp & Stair nera sump (Zero point) of Hogla-Damush CAD (SP ID-25237) Sub-Project Under Gomostapur Upazila, District: Chapai Nawabganj.
1012550 : SSSWRDP/Cha/WD-346/2024-25 Estimate for RCC Open Canal Wall Hight Extension (Brick Work) from ch. 0+450km to 0+950km=0.500km (B1-B2) of Nayagola-Mohananda CAD (SP-ID-22023) Sub-Project Under Sadar Upazila, District: Chapainawabganj.
1008061 : SSSWRDP/Cha/WD-345/2024-25 (Part-A): Laying of 1-500mm dia Upvc Buried pipe Main Line 1900m (O-N) from ch. 0+000km to 1+900km , 1-450mm dia Upvc Buried pipe main line 225m (N-M) from ch.1+900km to 2+125km, 1-400mm dia Upvc buried pipe main line 250m (M-L) from ch.2+125km to 2+375km, 1-355mm dia Upvc buried pipe main line 125m (L-K) from ch.2+375km to 2+500km, 1-315mm dia upvc buried pipe main line 250m (k-I) from ch.2+500km to 2+750km, 1-280mm dia upvc buried pipe main line 250m (I-H) from ch.2+750km to 3+000km (total length 3000m). (part-B): Construction of Rcc over Head tank (4.45mx3.00m) at ch. 0+000km of Gorokkhanathpur CAD (SP ID- 46278) Sub-project under sadar upazila District: Chapai Nawabganj.
999095 : UTMIDP-CHAP/GOMO/WT-227 Construction of Public Toilet at Morhum Kabul Hossain Jamia Arabia Qaumi Madrasha under Radhanagar Union under Gomostapur Upazila Dist.: Chapainawabganj
Share on Twitter