eGP Tender ID: 735980; Works (NCT)
APP ID: 187919;
District: Dhaka
Package Title: Strengthening and Widening of Road, Curve Straightening, Surfacing, Rigid Pavement and Construction of Bridge, Culvert, Underpass, Extension of Culvert, Protective work and others ancillary work at Ch. 0+000m to 18+500m of Aricha (Barangail)-Ghior-Daulatpur-Tangail (R 506) Regional Highway under Manikganj Road Division during the year 2022-2023 [WP- 01]
Organization: Roads & Highways Department (RHD)
Procuring Entity: Dhaka Zone
Procurement Method: One stage Two Envelopes Tendering Method
IFT Published on: 2022-10-27 21:05:00
Document last selling: 2022-11-28 17:00:00
Closing / Opening: 2022-11-29 12:00:00
Brief Description of Package: Strengthening and Widening of Road, Curve Straightening, Surfacing, Rigid Pavement and Construction of Bridge, Culvert, Underpass, Extension of Culvert, Protective work and others ancillary work at Ch. 0+000m to 18+500m of Aricha (Barangail)-Ghior-Daulatpur-Tangail (R 506) Regional Highway under Manikganj Road Division during the year 2022-2023 [WP- 01]
Tender Document Price: Tk. 4000;
Tender Security: 80000000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 2666666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 8000000000 BDT.
Thus, Official Cost Estimate should be BDT. 2666666666 ~ 8000000000.
Eligibility criteria:
All tenderers in Bangladesh registered in National e-GP system, who fulfill the qualification criteria as specified in the Tender Data Sheet (TDS) of the tender document.
The following conditions shall be considered:
1. As per consent of CPTU, the tenderers shall be evaluated in the e-GP system with the help of online database system – TDMS.
2. Qualification information and evidences (such as work experience certificates, on-going works list, payment certificates for construction turnover, equipment list (own or rented), personnel list etc) of the tenderers as mapped in the e-GP tenders must be available in the TDMS system so that TEC can evaluate the tenders digitally within short period of time.
3. If there is any conflicting information in TDMS and e-GP, the information provided in the e-GP system shall prevail.
4. A tenderer not having sufficient information in the TDMS system may be evaluated as ineligible.
5. Evaluation sheet generated by TDMS shall be uploaded into the e-GP system by the TEC.
N.B.: 1. The tenderer shall maintain highest ethics in providing information regarding Past Performance Evaluation and Rating Matrix for different aspects.
2. If corrupt, fraudulent, collusive, coercive or obstruction practices of any kind is determined against any tenderer, then measures shall be taken as per ITT clause 4 of Standard Tender Document.
Project: Improvement of Aricha (Barangail)-Ghior-Daulatpur-Nagarpur-Tangail (R-506) Regional Highway to appropriate Standard & Width
Location of work / delivery: At different Km
Budget Type: Development
Category: Engineering works and construction works; Works for complete or part construction and civil engineering work;
PE Address: Dhaka Zone, Elenbari, Tejgaon, City: Dhaka, Thana: Tejgaon, District: Dhaka - 0000, Country: Bangladesh,
See more tenders from
Dhaka Zone; Roads & Highways Department (RHD):
972480 : DZ/e-GP/07/Dev/2023-2024
Construction of 57.80 m (3 x 19.00) Long R.C.C Slab Bridge (Muslimhati-1 Bridge) at 7th (Ch.06+796m)km and 32.75 m ( 2x10.00m + 1x12.00m) Long R.C.C Slab Bridge (Gobindapur Bridge-2) at 12th(Ch. 11+951m) km of Magula-Jalalpur-Gobindopur-Tikerpur Road (Z-8204) under Road Division, Munshiganj during the year 2023-2024 (WP-40)
972479 : DZ/e-GP/06/Dev/2023-2024
Construction of 12.75 m (1x 12.00m) long R.C.C Slab Bridge (Katpotti) at 36th Km (Ch. 35+525), 12.75 m (1x 12.00m) long R.C.C Slab Bridge (Satiyan Mosjid) at 38th Km (Ch. 37+610) & Construction of Flexible Pavement in Place of Maliranko Bailey Bridge At 33th km on Fatulla (Panchabati) - Munshiganj (Muktarpur) - Lahajanj- Mawa Road (R- 812) under Munshiganj Road Division, Munshiganj during the year 2023-2024 (WP-39)
972478 : DZ/e-GP/05/Dev/2023-2024
Construction of Approach Road with Necessary Protective Works, Saucer & Cross drain and other ancillary works at Zitka Bridge 13th KM (part) of Shibalay-Nayarkandi-Balla-Harirampur Road (Z-5066) and Diabari Bridge at 21st Km. (Ch.20+913 m) on Baniajuri-Zitka-Harirampur Road (Z-5064) under Manikganj Road Division, Manikganj during the year 2023-2024 (WP-38)
954905 : DZ/e-GP/03/Dev/2023-2024
Construction of 33.54m (1 x 33.54m) long P.C Girder Bridge (Kosagara Bridge) at 17th Km & 6.00m long RCC slab bridge at 18th Km(P) of Kapasia-Pabur-Fuldi-Kaligonj Road (Z-3025) under Gazipur Road Division during the year 2023-2024.