eGP Tender ID: 748807; Goods (NCT)
APP ID: 185666;
District: Narayanganj
Package Title: Purchase of Instrument and Control Spares for Frame 9E Gas Turbine
Organization: Electricity Generation Company of Bangladesh (EGCB) Limited
Procuring Entity: Siddhirganj 2x120 MW Peaking Power Plant
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2022-11-29 10:00:00
Document last selling: 2022-12-19 16:00:00
Closing / Opening: 2022-12-20 14:00:00
Brief Description of Package: Purchase of Thermocouple & Connector Thermocouple for GE Gas Turbine (Frame-9E) for Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayanganj.
Tender Document Price: Tk. 1000;
Tender Security: 50000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 1000, estimated cost should be less than or equal 50 lacs BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 1666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 5000000 BDT.
Thus, Official Cost Estimate should be BDT. 1666666 ~ 5000000.
Eligibility criteria:
(a) The Tenderer shall have a minimum of 3 (Three) years of General Experience in the supply of Goods and related services.
(b) The satisfactory supply record of Electrical / Instrument & Control / Electronic Equipments of minimum Tk 12,00,000.00 (Twelve Lacs) in any Power Plant / a Large Organization / Industries within last 3 (Three) years under a successfully completed single contract.
or
The satisfactory supply record of Electrical / Instrument & Control / Electronic Equipments of minimum Tk 15,00,000.00 (Fifteen Lacs) in any Power Plant / a Large Organization / Industries within last 3 (Three) years under maximum 2 (two) contract successfully completed.
Satisfactory Work Completion Certificate / Acceptance Certificate stated 'Final Contract Price as Executed' must be submitted as documentary evidence of the supply record otherwise the tenderer will be considered as non-responsive. Notification of Award (NOA) or Purchase order (PO) or Contract agreement cannot be considered as the proof of supply record.
i.e. years counting backward from the date of publication of IFT in the e-GP System.
(c) The minimum amount of liquid assets, net of other contractual commitments is Tk. 18,00,000.00 (Eighteen Lacs) on the tender publishing date in the e-GP system or any later date. Supporting documents must be submitted (Stating the amount), otherwise the tenderer will be considered non-responsive.
Location of work / delivery: Siddhirganj 2x120 MW Peaking Power Plant Store, Siddhirganj Narayanganj
Budget Type: Own Fund
Category: Machinery for the production and use of mechanical power; Machinery, equipment, appliances, apparatus and associated products; Turbines and motors; Pumps and compressors; Taps, cocks, valves and similar appliances; Gears, gearing and driving elements;
PE Address: Siddhirganj, Narayanganj , City: Narayanganj, Thana: Siddhirganj, District: Narayanganj - 1430, Country: Bangladesh,
See more tenders from
Siddhirganj 2x120 MW Peaking Power Plant; Electricity Generation Company of Bangladesh (EGCB) Limited:
1045246 : FY 24-25 OPN GR 01
Procurement of chemicals for water treatment plant, Gas Booster Compressor (GBC) and Gas Turbine (GT).
1025630 : FY 24-25 EMD GR 02
Procurement of 132kV Cable differential protection relay and other spare parts for different electrical systems (switchgear, substation, etc.).
1025619 : FY 24-25 MMD PS 02
Procurement of Filter Cleaning and Filter Net changing works.
1020578 : FY 24-25 EMD GR 01
Procurement of Generator protection relay and other spare parts for different electrical systems (switchgear, substation, etc.).
1020374 : FY 24-25 INC GR 01
Purchase of Various type Instruments for Gas Turbine, GBC & BOP system.
1016632 : FY 24-25 MMD WR 11
Procurement of Painting Works of Gas Pipeline and other BOP Pipelines.