Login |Register

LTM tenders of Dhaka district. | OSTETM tenders of Dhaka zilla. | OTM tenders of Dhaka. | View All the active tenders of Dhaka district.

eGP Tender ID: 806912; Works (NCT)
APP ID: 185512; District: Dhaka
Package Title: Construction of Delivery line with Main transmission Line Inter-connection work for DTW 1-16 under SKWP
Organization: Dhaka Water Supply and Sewerage Authority (DWASA)
Procuring Entity: Office of the EE, Savar-Keraniganj Well Field Plant
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2023-03-27 10:00:00
Document last selling: 2023-04-10 17:00:00
Closing / Opening: 2023-04-11 11:00:00
Brief Description of Package: Construction of Delivery line with Main transmission Line Inter-connection work for DTW 1-16 under SKWP
Tender Document Price: Tk. 1000; Tender Security: 14000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 1000, estimated cost should be less than or equal 50 lacs BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 466666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 1400000 BDT.
Thus, Official Cost Estimate should be BDT. 466666 ~ 1400000.

Eligibility criteria:
As per TDS & PCC.
Location of work / delivery: SKWP Area
Budget Type: Revenue
Category: Repair and maintenance services for pumps, valves, taps and metal containers and machinery; Repair, maintenance and installation services; Repair and maintenance services of pumps, valves, taps and metal containers; Repair and maintenance services of machinery;
PE Address: Taranagar, Vakurta, Savar Dhaka, City: Vakurta, Thana: Savar, District: Dhaka - 1340, Country: Bangladesh,


See more tenders from Office of the EE, Savar-Keraniganj Well Field Plant; Dhaka Water Supply and Sewerage Authority (DWASA):
1058285 : 46.05.0000. 626.07.016.24.W88 Right of way cleaning/tree trimming work through 11 & 33 KV HT electrical line route in IRP#1 area
1050131 : 46.05.0000.626.35.045.24.W13 Construction of water line with ancillary works at east,west and north side of IRP-1 compound, Dhaka WASA
1050130 : 46.05.0000.626.07.009.24.W69 Construction of boundary fencing at south and east side of IRP#1 compound, SKWP
1050129 : 46.05.0000.626.07.030.24.W48 Painting of different pump stations in IRP#2 including fencing and boundary wall under SKWP
1050128 : 46.05.0000.626.07.031.24.W51 Repairing & painting of IRP#2 office building south and east side boundary wall under SKWP
1049624 : 46.05.0000.626.35.088.24.G32 Supply of maintenance free battery for Savar-Keraniganj Wellfild Plant
Share on Twitter