Login |Register

LTM tenders of Magura district. | OSTETM tenders of Magura zilla. | OTM tenders of Magura. | View All the active tenders of Magura district.

eGP Tender ID: 945873; Works (NCT)
APP ID: 201596; District: Magura
Reference No.: APP Code: APP/LGCRRP/Magura/2023-24-01
Package Title: 1. R-14=Upgrading of Balnagar Graveyard road (Balnagar Mosque to Magura-Dhaka road, Total Length=216.000m) at ward No.05, 2. X-D-14=Construction of Cross drain at Ch.0+206 of Balnagar Graveyard road ,Total Length=6.000m) at ward No.05, 3. R-19=Upgrading of Bouranatailo road (Part-A=Magura-Mohammadpur road to H/o.Younus, Part-B=Link road-Bouranatailo Modho para Mosque to H/o. Babu Mollah, Part-C=Magura-Mohammadpur road to Bouranatailo Purbo para Mosque, Total Length=515.000m at ward No.05, 4. R-09=Upgrading of Parnanduali Munshipara Eidgha road by lane (Eidgha road to H/o. Blue ,Total Length=20.000m) at ward No.06, 5. R-01=Upgrading of Parnanduali Roypara road (Parnanduali Biswas para main road to Parnanduali Bow-Bazaar road, Total Length=120.000m) at ward No.06, 6. D-01=Construction of RCC covered drain at Parnanduali Roypara (Parnanduali Biswas para main road to Parnanduali Bow-Bazaar road), Total Length=270.000m) at ward No.06, 7. R-20=Upgrading of Parnanduali Bapary para graveyard road (Parnanduali Bapary para graveyard to Naboganga river near H/o. Shahidul Haque ,Total Length=350.000m) at ward No.06, 8. R-21=Upgrading of Parla Southpara Road (From Part-A=Magura-Narail road near H/o.Kuddus Sheikh to H/o.Modhu Sheikh and Part-B=Magura-Narail road near H/o.Amir Khan to H/o.Alam Sheikh,Total Length=215.000m) at ward No.04, and 9. X-D-21=Construction of Cross drain at Ch.0+050 of Parla Southpara Road (Part-A=Magura-Narail road near H/o.Kuddus Sheikh to H/o.Modhu Sheikh), Total Length=6.000m) at ward No.04, Under LGCRRP, Fy2023-2024 in Magura Poarashava, Magura.
Organization: Magura Paurashava
Procuring Entity: Office of the Magura Pourashava, Magura
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2024-02-13 10:00:00
Document last selling: 2024-03-04 16:00:00
Closing / Opening: 2024-03-05 14:30:00
Brief Description of Package: LGCRRP/Magura/2023-24/W-09
1. R-14=Upgrading of Balnagar Graveyard road (Balnagar Mosque to Magura-Dhaka road, Total Length=216.000m) at ward No.05, 2. X-D-14=Construction of Cross drain at Ch.0+206 of Balnagar Graveyard road ,Total Length=6.000m) at ward No.05, 3. R-19=Upgrading of Bouranatailo road (Part-A=Magura-Mohammadpur road to H/o.Younus, Part-B=Link road-Bouranatailo Modho para Mosque to H/o. Babu Mollah, Part-C=Magura-Mohammadpur road to Bouranatailo Purbo para Mosque, Total Length=515.000m at ward No.05, 4. R-09=Upgrading of Parnanduali Munshipara Eidgha road by lane (Eidgha road to H/o. Blue ,Total Length=20.000m) at ward No.06, 5. R-01=Upgrading of Parnanduali Roypara road (Parnanduali Biswas para main road to Parnanduali Bow-Bazaar road, Total Length=120.000m) at ward No.06, 6. D-01=Construction of RCC covered drain at Parnanduali Roypara (Parnanduali Biswas para main road to Parnanduali Bow-Bazaar road), Total Length=270.000m) at ward No.06, 7. R-20=Upgrading of Parnanduali Bapary para graveyard road (Parnanduali Bapary para graveyard to Naboganga river near H/o. Shahidul Haque ,Total Length=350.000m) at ward No.06, 8. R-21=Upgrading of Parla Southpara Road (From Part-A=Magura-Narail road near H/o.Kuddus Sheikh to H/o.Modhu Sheikh and Part-B=Magura-Narail road near H/o.Amir Khan to H/o.Alam Sheikh,Total Length=215.000m) at ward No.04, and 9. X-D-21=Construction of Cross drain at Ch.0+050 of Parla Southpara Road (Part-A=Magura-Narail road near H/o.Kuddus Sheikh to H/o.Modhu Sheikh), Total Length=6.000m) at ward No.04, Under LGCRRP, Fy2023-2024 in Magura Poarashava, Magura
Tender Document Price: Tk. 2000; Tender Security: 425000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 2000, estimated cost should be more than 50 lacs BDT, but less than or equal 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 14166666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 42500000 BDT.
Thus, Official Cost Estimate should be BDT. 14166666 ~ 20000000.

Eligibility criteria:
As per Stated in TDS and all eligible countries of World Bank members countries and Contractor should be strictly followed the LGCRRP (Labor Intensive Public Works) LIPW Guidelines for Subproject/Schemes.
Project: Local Government COVID-19 Response and Recovery Project (LGCRRP), Magura Pourashava
Location of work / delivery: Magura Pourashava area
Budget Type: Development
Development Partner: World Bank
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: Upazila : Magura Sador District : Magura , City: Magura, Thana: Magura Sadar, District: Magura - 7600, Country: Bangladesh,


See more tenders from Office of the Magura Pourashava, Magura; Magura Paurashava:
1054306 : MP/ADP/GOB/2024-25/P-04 1. Improvement of Magura Pourashava Conference room by False celing, Wall paneling and Acoustic items Under pourashava ADP (GOB) fund fy'2024-2025 in Magura Pourashava, Magura. (PART-A-CIVIL WORK) and 2. Improvement of Magura Pourashava Conference room by False celing, Wall paneling and Acoustic items Under pourashava ADP (GOB) fund fy'2024-2025 in Magura Pourashava, Magura. (PART-B-Electrification Works)
1048584 : LGCRRP/Magura/2024-25/W-15 D-30=Construction of RCC Covered drain at Dari-Magura Karighor para road by lane (From Karighor para main road near H/O. Shohagh to H/O. Hazi Bazlur Rahman, Ch.0+000-0+250 , Total Length=250.000m) at ward No.08 and 2. X-D-30=Construction of RCC Cross drain at Dari-Magura Karighor para main road, Length=10.000m (At starting point of Karighor para main road ) at ward No.08, Under LGCRRP, Fy' 2024-2025 in Magura Pourashava, Magura.
1048567 : LGCRRP/Magura/2024-25/W-14 Construction of RCC Covered drain at East side of Dari-Magura KariKhor para road (From Magura-Jhenaidah road near Bashtala to Naboganga River, Ch.1+200-1+790, Total Length=590.000m) at ward No.02, Under LGCRRP, Fy' 2024-2025 in Magura Pourashava, Magura.
971807 : LGCRRP/Magura/2023-24/W-11 Construction of Main Gate with Front side (Nortth) boundary wall of Magura Poura central Graveyard area at ward No.03, Under LGCRRP, Fy2023-2024 in Magura Poarashava, Magura.(PART-A-Gate with Boundary wall)
945876 : LGCRRP/Magura/2023-24/W-10 1. R-16=Upgrading of Stadium para main BC road (Magura-Jhenaidah road to Back side of IT park, Total Length=500.000m) at ward No.02, 2. R-17=Upgrading of Stadium para Uni-block road (Part-A=Magura-Jhenaidah road Infront of LGED Office to H/o. Uzair, Part-B=Stadium para Mosque to H/o. Zhaidul, Total Length=180.000m) at ward No.02, 3.R-05=Upgrading of Abulpur Purbopara BC road (From Darua main road to Abulpur Purbopara road, Total Length=200.000m) at ward No.01, 4. X-D-05=Construction of Cross drain at Ch.0+075 of Abulpur Purbopara road, Total Length=6.000m) at ward No.01, 5. R-23=Upgrading of Kasinathpur Road (Part-A=Magura-Jhenaidah road near H/o.Joha to H/o.Jaman and Part-B=Magura-Jhenaidah road to Lasker para Mosque,Total Length=705.000m) at ward No.01, 6. X-D-23-i=Construction of Cross drain at Ch.0+020 of Kasinathpur Main Road Browpit Total Length=10.000m) at ward No.01, 7. X-D-23-ii=Construction of Cross drain at Ch.0+210 of Kasinathpur Road (From Part-A=Magura-Jhenaidah road near H/o.Joha to H/o.Jaman),Total Length=6.000m) at ward No.01, 8. X-D-23-iii=Construction of Cross drain at Ch.0+020 of Kasinathpur Road (Part-B=Magura-Jhenaidah road to Lasker para Mosque),Total Length=6.000m) at ward No.01 and 9. R-26=Upgrading of Kashinathpur main road by lane (Kashinathpur main road near H/o. Moshair to H/o. Adv. Sakib, Total Length=130.000m) at ward No.01, Under LGCRRP, Fy2023-2024 in Magura Poarashava, Magura.
945793 : LGCRRP/Magura/2023-24/W-08 1. R-02=Upgrading of AL-Amin Yatim-Khana road by lane (Part-A=Yatim Khana to H/o.Soriful Islam, Part-B=Ch.0+145 at part-A to H/o. Romjan Ali, and Part-C=Ch.0+056 at Part-B to H/o. Taharul Islam, Total Length=430.000m) at ward No.08, 2. R-18=Upgrading of Saha para road (CARE road to Rashed-Salim road ,Total Length=310.000m at ward No.08, 3. R-22=Upgrading of Dori-Magura Saha para Road by lane (Dori-Magura Saha para main Road near H/o.Ausutosh to H/o.Pranash,Total Length=180.000m) at ward No.08, 4. R-03=Upgrading of Hospital Para main road by lane (Subessa School to H/o.Abul khair, Total Length=120.000m) at ward No.09, 5. D-03=Construction of RCC covered drain at Hospital Para main road by lane (Part-A=Subessa School to DC Office main Drain ,Part-B=H/o. Dr.Saifur Rahman to Proposed Drain, and Part-C=H/o. Abul Khair to Main drain, Total Length=125.000m) at ward No.09, 6. R-10=Upgrading of Hazi shahabe road by lane ( Madrasha to H/o.Hazi shahabe ,Total Length=100.000m) at ward No.09, 7. R-08=Upgrading of Nomanimoidan road by lane (H/o.Dr.M.S Akbor (MP) to H/o. Nahid, Total Length=58.000m) at ward No.09, 8. R-06=Upgrading of Dari-Magura Karighor para road by lane (H/o. Ripon to Police Line School, Total Length=95.000m) at ward No.08, 9. D-06=Construction of RCC covered drain at Dari-Magura Karighor para road by lane (H/o. Ripon to Police Line School, Total Length=95.000m) at ward No.08, 10. X-D-06=Construction of Cross drain at Dari-Magura Karighor para road , Total Length=10.000m at ward No.08, 11. R-24=Upgrading of Nisnanduali Kuthi-Bari road (Main road near A.N. Shamilony School to H/o. Palash Audhikary, Total Length=272.000m) at ward No.07, 12. R-25=Upgrading of Kanda bash khota road (H/o.Bijoy Sharkar to H/o. Faruk, Total Length=370.000m) at ward No.07 and 13. R-27=Upgrading of Nisnanduali Charpara Mosque road (H/o. Aupu to Nisnanduali Charpara Mosque , Total Length=132.000m) at ward No.07, Under LGCRRP, Fy2023-2024 in Magura Poarashava, Magura.
945209 : LGCRRP/Magura/2023-24/W-07 1. Upgrading of Magura Poura central Graveyard (PART-B=Internal Footpath with Earth filling) (Ch. 360m) at ward No.03 and 2. Improvement of Magura Poura central Graveyard (PART-C=Lighting arrangement) (Ch. 2700m) at ward No.03, Under LGCRRP, Fy2023-2024 in Magura Poarashava, Magura
Share on Twitter