LTM tenders of Brahmanbaria district. |
OSTETM tenders of Brahmanbaria zilla. |
OTM tenders of Brahmanbaria. |
View All the active tenders of Brahmanbaria district.
eGP Tender ID: 951178; Works (NCT)
APP ID: 201031;
District: Brahmanbaria
Reference No.: LGCRRP/Nabinagar/2023-24/W-04 (Re-Tender)
Package Title: (i) CRRP-09): Rehabilitation of College para road (Ch0-00 to 0+371km) at Ward-04.
Organization: Nabinagar Pourashava
Procuring Entity: Office of the Nabinagar Pourashava, Brahmanbaria
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2024-02-18 09:00:00
Document last selling: 2024-02-28 17:00:00
Closing / Opening: 2024-02-29 13:00:00
Brief Description of Package: (i) CRRP-09): Rehabilitation of College para road (Ch0-00 to 0+371km) at Ward-04.
(ii) (CRRP -09): Environmental Management Work for Rehabilitation of College para road (Ch0+00 to 0+371km) at Ward-04.
(iii) (CRRP -09): Road Safety Work for Rehabilitation of College para road (Ch0+00 to 0+371km) at Ward-04.
(iv) (CRRP -10): Rehabilitation Uni-block road from Matrichaya school to Halim Mia's house (Ch0+00 to 0+320 km) at Ward-04.
(v) (CRRP -10): Road Safety Work for Rehabilitation Uni-block road from Matrichaya school to Halim Mia's house (Ch0+00 to 0+320 km) at Ward-04.
(vi) (CRRP -11): Maintenance of Kallol Mia's house to Atik Commander's house road (Ch0+00 to 0+337km. Ward no-05 (vii) (CRRP-11): Road Safety Work for Maintenance of Kallol Mia's house to Atik Commander's house Road (Ch0+00 to 0+337km) Ward no-05
Tender Document Price: Tk. 2000;
Tender Security: 200000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 2000, estimated cost should be more than 50 lacs BDT, but less than or equal 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 6666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 20000000 BDT.
Thus, Official Cost Estimate should be BDT. 6666666 ~ 20000000.
Eligibility criteria:
As Per TDS
Winning tenderer will follow the Guidelines for Labor Intensive Public Works for LGCRRP as according identified schemes during the implementation of the works.
Project: Local Government COVID-19 Response and Recovery Project, (Nabinagar Paurashava, Brahmanbaria)
Location of work / delivery: Nabinagar Pourashava
Budget Type: Development
Development Partner: World Bank
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: Nabinagar Pourashava, Brahmanbaria., City: Nabinagar, Thana: Nabinagar, District: Brahmanbaria - 3410, Country: Bangladesh,
See more tenders from
Office of the Nabinagar Pourashava, Brahmanbaria; Nabinagar Pourashava:
1060090 : LGCRRP/Nabinagar/2024-2025/W-11
(1) Upgrading of Uni-block road from Freedom Fighter Jahor miah's house to Mazikara Culvert via polash's house (Ch.-355+00 to 0+ 727 km) (W-05).
(2) Rehabilitation of Uni-block road from Dr. Amzad's house to Aziz Amin's house via Jalil's house & Loknath Asrom at Panchabati. (Ch.-00+217 to 00+ 618 km) (W- 02)
1060089 : LGCRRP/Nabinagar/2024-2025/W-10
(1) Rehabilitation of RCC Connecting road from Aliabad Market to Radhika road. (Ch.00+00 to 0+ 358 km) (W- 06)
(2) Construction of Dulabari Eidgah road (Ch.-00+377 to 00+ 577 km) (W-09)
1060088 : LGCRRP/Nabinagar/2024-2025/W-09
Construction of RCC drain with slab from T&T to Sab Bari Mosque via Sakku market. (Ch:-00+00 to 00+ 442 km) (W-03)
1060087 : LGCRRP/Nabinagar/2024-2025/W-08
(1) Maintenance of RCC road from Alamnagar south par Foot Bridge to Auto stand. (Ch. 00+634 to 00+ 798 km) (Ward-01)
(2) Construction of Nabinagar - Fatehpur RCC drain (Ch: 00+312 to Ch: 00+492) km and Link Drain (Ch:00+00 to 00+206) km at Ward-02, (Part-02)
(3) Maintenance of Nabinagar - Fatehpur RCC road (Ch. 00+312 to 0+492 km) at Ward-02, (Part-02)
985531 : LGCRRP/Nabinagar/2023-24/W-07
Upgrading of Uni-block road from Faruk mia's nursery to REB road via Bivo chowdhuris house along Bholachong R & H road. ch:- 00+00 to 0+400 km.at Ward no-09
Road Safety Work for Unl-block road from Faruk mia's nursery to REB road via Bivo chowdhuris house along Bholachong R & H road. ch:- 00+00 to 0+400 km. at Ward no-09
Environmental Management Work for Uni-block road from Faruk mia's nursery to REB road via Bivo chowdhuris house along Bholachong R & H road. ch:-00+00 to 0+400 km. at Ward no-09
Protective Work for Uni-block road from Faruk mia's nursery to REB road via Bivo chowdhuris house along Bholachong R & H road. ch:- 00+00 to 0+400 km.at Ward no-09
951518 : LGCRRP/Nabinagar/2023-24/W-06
(i) (CRRP-13): Rehabilitation of Uni-block road from Bholachang old Bazar to kheaghat (Godara ghat) (Ch0+00 to 0+465 km) at Ward no - 08.
(ii) (CRRP-13): Road Safety Work for Rehabilitation of Uni-block road from Bholachang old Bazar to kheaghat (Godara ghat) (Ch0+00 to 0+ 465 km) at Ward no - 08.
(iii) (CRRP-15): Rehabilitation of internal RCC road of Bholachang new Bazar (Ch:- 00+00 to 0+283 km) with Link-01: (Ch:00-72 m) & (Link -02: Ch:00-127 m) at Ward-09
(iv) (CRRP-15): Road Safety Work for Rehabilitation of internal RCC road of Bholachang new Bazar (Ch:- 00+00 to 0+283 km) with Link-01: (Ch:00-72 m) & (Link -02: Ch:00-127 m) at Ward- 09
(v) (CRRP-15): Environmental Management work for Rehabilitation of internal RCC road of Bholachang new Bazar (Ch:- 00+00 to 0+283 km) with Link-01: (Ch:00-72 m) & (Link - 02: Ch:00-127 m) at Ward-09