eGP Tender ID: 957802; Works (NCT)
APP ID: 196050; District: Khulna
Reference No.: APP ID : 196050
Package Title: Construction of rupsa wholesale fish market Sluice gate cum pump house with 5.5 cumec 3 nos submersible pumps , 3-vent (1.5 m x 1.8 m). upstream and downstream R.C.C. U channel, with 2 box culverts with fencing.
Organization: Khulna City Corporation
Procuring Entity: Executive Engineer Zone A
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2024-03-07 10:45:00
Document last selling: 2024-04-15 17:00:00
Closing / Opening: 2024-04-16 10:40:00
Brief Description of Package: KCC/IDSRWLP/XEN/Zone-A/2023-24/W-05
Construction of rupsa wholesale fish market Sluice gate cum pump house with 5.5 cumec 3 nos submersible pumps , 3-vent (1.5 m x 1.8 m). upstream and downstream R.C.C. U channel, with 2 box culverts with fencing.
Tender Document Price: Tk. 4000; Tender Security: 18000000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 600000000.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 1800000000 BDT.
Thus, Official Cost Estimate should be BDT. 600000000 ~ 1800000000.

Eligibility criteria:
As per TDS and ITT
 
1. Similar nature of work : TK 35,00,00,000.00 ( Related Work to Pump house )
2. Average annual construction turnover : TK 100,00,000.00 ( Over the Best 3 Years in the Last 5 Years )
3. Liquid assets or working capital TK : 35,00,00,000.00
4. Tender Capacity : 50,00,00,000.00
5. Payment will be made upon availability of fund. For this, no claim will be entertained.
6. Quoted amount of tender beyond 10% above/less than official estimated cost will be non-responsive.
7. VAT & IT from bill will be as per prevailing Government Rate. No extra claim will be entertained in this regard.
8. To ensure the Quality of the material, Various tests shall be performed by the tenderer as per instruction.
 
N.B:
i. Maintenance and operation of pump house will be done by contractor free of cost for up to one year after completion of whole work.
ii. Security period will be 24 months.
iii. The contractor have to trained the operating system of pump house to three persons from KCC for free of cost.
iv. Fifty percent tender security money will be released after 12 months if the system will be run proprely.
Project: Imrovement of Drainage System for reducing Water Logging Problem in Khulna City Corporation
Location of work / delivery: Khulna City Corporation
Budget Type: Development
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: 28 KD GHOSH ROAD, City: Khulna, Thana: Khulna City Corporation, District: Khulna - 9100, Country: Bangladesh,


See more tenders from Executive Engineer Zone A; Khulna City Corporation:
1058828 : LGCRRP/KHULNA/2024-25/W-22 Construction of Mourner's Rest House at Rupsha Maha Shamshan (Ward No-30)
1023109 : KCC/IDSRWLP/XEN/Zone-A/2023-24/W-48 Construction of Drain Boyra Junction Road to Rayermahal School road (Muzgunni Mohasarak to Rayer Mahal College)
1022831 : LGCRRP/KHULNA/2023-24/W-15 Repair & Maintenance of Munshipara 3rd lane, Diabetic Centre Adjacent to Sir Iqbal Road, Khulna, Najirghat Main Road Bylane and Pathan Bari Goli Bylane and Installation of GI Pole and Light of Munshipara 3rd lane .
1022820 : LGCRRP/KHULNA/2023-24/W-16 Repair & Maintenance of Modhodanga Main Road. (Ch:00-662m) (ward-03), Construction of Mosheswarpasha Graveyard Boundary Wall & Internal Road. (ward-03) , Construction of Office Building at Deyana Morolpara Graveyard, Repair & Maintenance of Muzgunni Residential Aria Road no-10 (Ch:00-149.00m).
1022807 : LGCRRP/KHULNA/2023-24/W-17 Repair & Maintenance of Khalishpur 223 no Road with Partial Drain and Upgrading of RCC road with drain Jayanty Para Karai Company Road .
1021857 : KCC/IDSRWLP/XEN/Zone-A/2023-24/W-40 Construction of Drain DPP No-161 er nam poribortan 28 no ward officer purbo paser drain (Khan jahan Ali Road er drain hote Binodini hospital porjonto) Drain nirman and bivinno songjog drain soho bivinno puraton drain er slab nirman, DPP: 161, Ward: 28 (Total Drain Length= 0.763 km.)
See live tender notices for box culvert.
Share on Twitter