LTM tenders of Netrokona district. |
OSTETM tenders of Netrokona zilla. |
OTM tenders of Netrokona. |
View All the active tenders of Netrokona district.
eGP Tender ID: 988502; Works (NCT)
APP ID: 197174;
District: Netrokona
Reference No.: 45.00.0000.155.26.003.23-29 dt: 29/4/24
Package Title: Supplying , fitting & fixing of Aircooler in different doctor room of outdoor department, repair of old aircooler, supplying fitting & fixing of electrical light, fan, switch socket, wiring , circuit breaker alongwith ancillaries electrical works at ground floor & 1st floor of district sadar hospital Netrokona during FY 2023-24
Organization: Public Works Department (PWD)
Procuring Entity: Netrokona pwd division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2024-05-20 13:10:00
Document last selling: 2024-06-03 15:19:00
Closing / Opening: 2024-06-04 11:19:00
Brief Description of Package: Supplying , fitting & fixing of Aircooler in different doctor room of outdoor department, repair of old aircooler, supplying fitting & fixing of electrical light, fan, switch socket, wiring , circuit breaker alongwith ancillaries electrical works at ground floor & 1st floor of district sadar hospital Netrokona during FY 2023-24
Tender Document Price: Tk. 1000;
Tender Security: 20000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 1000, estimated cost should be less than or equal 50 lacs BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 2000000 BDT.
Thus, Official Cost Estimate should be BDT. 666666 ~ 2000000.
Eligibility criteria:
This invitation for Tender is open to all eligible Tenderers as mentioned below:
1. Reputed Contractors / Construction Firms who have minimum 3 years of general experience in construction works.
2. Having Experience in successful completion of at least 1(one) similar work with amounting to Tk.6 lakh during last 3 (three) years in a single tender in Government /Semi -Government/ Autonomous Organization of Bangladesh, years counting backward form the date of publication of IFT in the newspaper.
3. The tenderers shall have a minimum average annual construction turn over Tk.8lakh during the last 3 (three) years.
4. The Tenderers shall have minimum Liquid asset or working capital/credit facilities shall be Tk.5 lakh..credit commitment shouild be submitted.
5. The tenderer will have to submit the following papers/ document along with other relevant papers/documents.
(a)Up to date income tax clearance certificate .
(b)Up to date trade License and ABC/1st/2nd/.3rd class cncerned licence copy .
(c)Valid VAT Registration certificate from the concerned office.
Other required eligibility and conditions of the tenderer are shown in the Tender Data sheet (TDS) of tender documents
Location of work / delivery: Sadar Netrokona
Budget Type: Revenue
Category: Electricity, gas, nuclear energy and fuels, steam, hot water and other sources of energy; Electricity; Manufactured gas; Coal gas or similar gases; Mains gas; Steam, hot water and associated products; Hot water; Steam; District heating; Long-distance heating; Solar energy; Solar panels; Solar installation; Nuclear fuels; Uranium; Plutonium; Radioactive materials; Radio-isotopes
PE Address: Netrokona pwd division ,Netrakona, City: Netrokona, Thana: Netrakona Sadar, District: Netrokona - 2400, Country: Bangladesh,
See more tenders from
Netrokona pwd division; Public Works Department (PWD):
1065510 : kidney/APP/24-25/Netro/001
Establishment of a Kidney Dialysis Centre at 250 beded Netrokona District Hospital under the project of Upgradation of the Existing Kidney Dialysis Centre of Medical College Hospitals upto 50 beds and Establishment of 10 beded Kidney Dialysis Centre at District Hospitals.(1st revised) during FY 2024-25
1025067 : egp/culvert/kendua/Mosque/007
Establishment of 560 Nos Model Mosque & Islamic Cultural Center in Zila & Upazila of Bangladesh(2nd Revised). Sub Head:- Construction of a culvert during the construction period of new infront of kendua Upazila Model Mosque, kendua, Netrokona.
1024979 : egp/Temp./Madan/Mosque/002
Establishment of 560 Nos Model Mosque & Islamic Cultural Center in Zila & Upazila of Bangladesh(2nd Revised). Sub Head:- Construction of a temporary mosque during the construction period of new Madan Upazila Model Mosque,Madan, Netrokona.
1024978 : egp/Temp./Mohonganj/Mosque/003
Establishment of 560 Nos Model Mosque & Islamic Cultural Center in Zila & Upazila of Bangladesh(2nd Revised). Sub Head:- Construction of a temporary mosque during the construction period of new Mohonganj Upazila Model Mosque,Mohonganj, Netrokona.
1024977 : egp/Temp./kolmakanda/Mosque/004
Establishment of 560 Nos Model Mosque & Islamic Cultural Center in Zila & Upazila of Bangladesh(2nd Revised). Sub Head:- Construction of a temporary mosque during the construction period of new Kolmakanda Upazila Model Mosque,Kolmakanda, Netrokona.
1024976 : egp/Temp./Durgapur/Mosque/005
Establishment of 560 Nos Model Mosque & Islamic Cultural Center in Zila & Upazila of Bangladesh(2nd Revised). Sub Head:- Construction of a temporary mosque during the construction period of new Durgapur Upazila Model Mosque,Durgapur, Netrokona.