Login |Register

LTM tenders of Satkhira district. | OSTETM tenders of Satkhira zilla. | OTM tenders of Satkhira. | View All the active tenders of Satkhira district.

eGP Tender ID: 690979; Works (NCT)
APP ID: 180210; District: Satkhira
Package Title: Re-excavation of Labu Haji khali khal from km. 0.000 to km. 0.520= 520 meter, Mashkhola khal from km. 0.000 to km. 0.435= 435 meter, Navabkhali khal from km. 0.000 to km. 3.480= 3480 meter, Omarkhali khal from km. 0.000 to km. 2.060= 2060 meter, Rajnagar khal from km. 0.000 to km. 2.010= 2010 meter, Sallah khal from km. 0.000 to km. 1.150= 1150 meter, Total length = 9655 meter in connection with "Drainage Improvement of Polder 1, 2, 6-8, 6-8 (extn) in Satkhira District" under Satkhira O&M Division, BWDB, Satkhira.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Satkhira O&M Division-2
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2022-04-27 12:00:00
Document last selling: 2022-05-25 16:00:00
Closing / Opening: 2022-05-30 12:50:00
Brief Description of Package: Re-excavation of Labu Haji khali khal from km. 0.000 to km. 0.520= 520 meter, Mashkhola khal from km. 0.000 to km. 0.435= 435 meter, Navabkhali khal from km. 0.000 to km. 3.480= 3480 meter, Omarkhali khal from km. 0.000 to km. 2.060= 2060 meter, Rajnagar khal from km. 0.000 to km. 2.010= 2010 meter, Sallah khal from km. 0.000 to km. 1.150= 1150 meter, Total length = 9655 meter in connection with "Drainage Improvement of Polder 1, 2, 6-8, 6-8 (extn) in Satkhira District" under Satkhira O&M Division, BWDB, Satkhira.
Tender Document Price: Tk. 4000; Tender Security: 800000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 26666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 80000000 BDT.
Thus, Official Cost Estimate should be BDT. 26666666 ~ 80000000.

Eligibility criteria:
1 . Payment of work will be made on available of budget & fund release.For this no Claim/interest of Delaying of Payment will be entertained.
2. If any type of Structures/Obstracles is needed to dismantle to execute the work as per Design & Specification, the selected Contractor will do this at his
own cost & arrangement. No Extra claim will be entertaintd in this regard.
3. Representative still picture & video of prework & postwork of same location will be taken by contractor and submit to Procuring entity at contractor's own
cost.
4. Quantity of work may extremely increase or decrease.
5. Design may also be changed or modified (if required).
6. Prework & Postwork may be also taken by taskforce or other agency or jointly as per instruction of Higher Authority or PE
7.Cost of Interim and post work survey will be borne by the contractor. No extra claim will be entertained.
8.After completion the Whole work final Measurement will be Taken.Final bill will be paid on the basis of Final measurement
9.Spoil earth management will be followed as per instruction of Engineer in Charge.
10. Earthen Dyke will be constructed by excavated earth along the River/Canal sides considering the existing surrounding & land proprietorship as per direction of engineer in Charge. No financial claim for construction of earthen Dyke will be allowed.
11.Contract will be terminated if contractor's personnel is involved in any kind of unauthorized/illegal financial transaction from the locals during eviction work.
Project: Drainage Improvement of Polder 1, 2, 6-8 & 6-8 (Extention) in Satkhira District.
Location of work / delivery: Satkhira Sadar, Assasuni Upazila, Satkhira
Budget Type: Development
Category: Construction work for water projects; Works for complete or part construction and civil engineering work;
PE Address: Itagachha, Satkhira, City: Satkhira, Thana: Satkhira Sadar, District: Satkhira - 9400, Country: Bangladesh,


See more tenders from Satkhira O&M Division-2; Bangladesh Water Development Board (BWDB):
1025550 : Sat-2/38 Repair of protection work from Km. 0.350 to km 0.720 = 370.00 m & from Km. 0.885 to km 1.125 = 240.00 m total = 610.00m in Polder No-14/1 under "Rehabilitation of Polder No-14/1 in Khulna District" under Satkhira O&M Division-2, BWDB, Satkhira.
1025549 : Sat-2/09 River bank protection work from km 3.710 to km 4.145=435.00 meter in polder No-14/1 under Rehabilitation of polder No-14/1 in khulna District under Satkhira O&M Division-2, BWDB, Satkhira.
1025548 : Sat-2/08 River bank protection work from km 3.275 to km 3.710=435.00 meter in polder No-14/1 under Rehabilitation of polder No-14/1 in khulna District under Satkhira O&M Division-2, BWDB, Satkhira.
1025547 : Sat-2/06 River bank protection work from km 1.125 to km 1.575=450.00 meter in polder No-14/1 under Rehabilitation of polder No-14/1 in khulna District under Satkhira O&M Division-2, BWDB, Satkhira.
976772 : W-Sat-2/53 Re-Excavation of Morichap River from km. 29.365 to km. 30.500 = 1135 meter in Polder No-2 at Assasuni Upazilla in c/w "Drainage Improvement of Polder No. 1, 2, 6-8 & 6-8 (Ext.) in Satkhira District" Under Satkhira O&M Division-2, BWDB, Satkhira during the FY 2023-2024.
Share on Twitter