LTM tenders of Satkhira district. |
OSTETM tenders of Satkhira zilla. |
OTM tenders of Satkhira. |
View All the active tenders of Satkhira district.
eGP Tender ID: 694319; Works (NCT)
APP ID: 184580;
District: Satkhira
Package Title: Construction of Protective work from Km 2.985 to Km 4.255 = 1270.00 m at Jelekhali in Polder No. 4 Upazilla- Assasuni, Dist. Satkhira in connection with "Disaster Risk Management Enhancement Project (Component-1, BWDB Part)" under Satkhira O&M Division-2, BWDB, Satkhira during the year 2021-2022.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Satkhira O&M Division-2
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2022-05-16 20:00:00
Document last selling: 2022-06-15 16:00:00
Closing / Opening: 2022-06-16 12:00:00
Brief Description of Package: Construction of Protective work from Km 2.985 to Km 4.255 = 1270.00 m at Jelekhali in Polder No. 4 Upazilla- Assasuni, Dist. Satkhira in connection with "Disaster Risk Management Enhancement Project (Component-1, BWDB Part)" under Satkhira O&M Division-2, BWDB, Satkhira during the year 2021-2022.
Tender Document Price: Tk. 4000;
Tender Security: 4500000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 150000000.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 450000000 BDT.
Thus, Official Cost Estimate should be BDT. 150000000 ~ 450000000.
Eligibility criteria:
1) All tenderer must be registered in e-gp portal system.
2) Payment will be made upon availability of fund; no claim will be entertained.
3) It is the tenderer's responsibility to submit all documents in their original form. If any documents become corrupted and the evaluation team is unable to open the file, no claim will be considered.
4) VAT & IT from bill will be deducted as per prevailing Government Rate.
5) If any type of Structure/Obstrucle is needed to dismantle to execute the work as per Design & Specification, the tenderer will do this at his own expense.No extra claims will be considered.
6) The tenderer must follow the latest instructions and formats of CPTU.
7) If BWDB owned land is not sufficient to execute the work as per design & Specification, the bidder will do this at his own expense and planning.
8) It is mandatory to submit video and still photographs of the said work in pre-work and post work condition to PE at contractor's own cost.
9) Quantity of work may extremely change and Design may also be modified.
10) Cost of pre work, interim and post-work survey will be borne by the contractor.
11) The work must be executed as per approved design uploaded at Sec-9 & technical specifications of BWDB uploaded at Sec-7 of tender document.
12) The approved taskforce guideline uploaded at Sec-8 will be followed.
13) In addition to BWDB, the consultant of DRMEP project will monitor and check the quality and quantity of executed work.
14) Tenderer/Firm must sign and submit duly filled-in ‘JICA’s Acknowledgement of Compliance (Form ACK) and must state its financial situation in accordance with the Form FIN-1 of JICA’s Bidding Document uploaded as Appendix-1 and Appendix-2 at Sec-7 of tender document as per ITT 4.4 and ITT 5.5 resp
Project: Disaster Risk Management Enhancement Project (Component-1, BWDB Part)
Location of work / delivery: Assasuni Upazila, Satkhira
Budget Type: Development
Development Partner: Japan International Cooperation agency(JICA)
Category: Construction work for water projects; Works for complete or part construction and civil engineering work;
PE Address: Itagachha, Satkhira, City: Satkhira, Thana: Satkhira Sadar, District: Satkhira - 9400, Country: Bangladesh,
See more tenders from
Satkhira O&M Division-2; Bangladesh Water Development Board (BWDB):
1025550 : Sat-2/38
Repair of protection work from Km. 0.350 to km 0.720 = 370.00 m & from Km. 0.885 to km 1.125 = 240.00 m total = 610.00m in Polder No-14/1 under "Rehabilitation of Polder No-14/1 in Khulna District" under Satkhira O&M Division-2, BWDB, Satkhira.
1025549 : Sat-2/09
River bank protection work from km 3.710 to km 4.145=435.00 meter in polder No-14/1 under Rehabilitation of polder No-14/1 in khulna District under Satkhira O&M Division-2, BWDB, Satkhira.
1025548 : Sat-2/08
River bank protection work from km 3.275 to km 3.710=435.00 meter in polder No-14/1 under Rehabilitation of polder No-14/1 in khulna District under Satkhira O&M Division-2, BWDB, Satkhira.
1025547 : Sat-2/06
River bank protection work from km 1.125 to km 1.575=450.00 meter in polder No-14/1 under Rehabilitation of polder No-14/1 in khulna District under Satkhira O&M Division-2, BWDB, Satkhira.
976772 : W-Sat-2/53
Re-Excavation of Morichap River from km. 29.365 to km. 30.500 = 1135 meter in Polder No-2 at Assasuni Upazilla in c/w "Drainage Improvement of Polder No. 1, 2, 6-8 & 6-8 (Ext.) in Satkhira District" Under Satkhira O&M Division-2, BWDB, Satkhira during the FY 2023-2024.