Login |Register

LTM tenders of Dhaka district. | OSTETM tenders of Dhaka zilla. | OTM tenders of Dhaka. | View All the active tenders of Dhaka district.

eGP Tender ID: 792679; Works (NCT)
APP ID: 190969; District: Dhaka
Package Title: Construction of Main Gate at Shopnonogar 2nd Phase Project Site at Mirpur, Dhaka under Dhaka Division-1, National Housing Authority.
Organization: National Housing Authority
Procuring Entity: Dhaka Division 1
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2023-02-23 09:00:00
Document last selling: 2023-03-09 17:00:00
Closing / Opening: 2023-03-12 14:00:00
Brief Description of Package: Construction of Main Gate at Shopnonogar 2nd Phase Project Site at Mirpur, Dhaka under Dhaka Division-1, National Housing Authority.
Tender Document Price: Tk. 2000; Tender Security: 160000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 2000, estimated cost should be more than 50 lacs BDT, but less than or equal 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 5333333.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 16000000 BDT.
Thus, Official Cost Estimate should be BDT. 5333333 ~ 16000000.

Eligibility criteria:
As per TDS
Location of work / delivery: Section-9,Mirpur,Dhaka
Budget Type: Own Fund
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: National Housing Authority Section-2 Mirpur , City: Dhaka, Thana: Mirpur, District: Dhaka - 1216, Country: Bangladesh,


See more tenders from Dhaka Division 1; National Housing Authority:
1044170 : NHA/DD-1/Remaining-13-22/2024-2025 Remaining work of construction of 14 (Fourteen) storied Residential flats Building Number-13 (Heaving area 1338.00 Sft) & Building Number-22 (Heaving area 1545.00 Sft) for selling to the Low and middle income group of peoples at section -9, Mirpur, Dhaka. (Basement+14 storied)
1025366 : NHA/DD-1/W-Main Gate/2024-2025 Construction of Remaining 01 (One) Nos Main Gate at Shapnonagar 2nd Phase Project at Section-9,Mirpur,Dhaka , Under Dhaka Division-1, National Housing Authority.
1012983 : NHA/DD-1/Arboriculture/2024-2025 Arboriculture work of 15 Nos 14- storied residential flat building project site for Low & Midium Income Group, Section-9 at Mirpur, Under Dhaka Division-1, during the year 2024-25.
1012982 : NHA/DD-1/Retaining Wall/2024-2025 Palisading/Retaining wall construction work of Shopnonogar 2nd Phase project site at Mirpur,Dhaka under Dhaka Division-1, National Housing Authority.
1012981 : NHA/DD-1/W-Sub Gate/2024-2025 Construction of 06 (Six) Nos Sub Gate and Guard Room at Shopnonogar 2nd Phase project site at Mirpur,Dhaka under Dhaka Division-1, National Housing Authority.
1012980 : NHA/DD-1/W-Main Gate/2024-2025 Construction of Remaining 01 (One) Nos Main Gate at Shapnonagar 2nd Phase Project at Section-9,Mirpur,Dhaka , Under Dhaka Division-1, National Housing Authority.
Share on Twitter