LTM tenders of Dhaka district. |
OSTETM tenders of Dhaka zilla. |
OTM tenders of Dhaka. |
View All the active tenders of Dhaka district.
eGP Tender ID: 876289; Works (NCT)
APP ID: 195407;
District: Dhaka
Reference No.: 33.02.0000.949.14.020.23-1934 Date: 03/10/2023
Package Title: Upgrading and Modernization of Existing 10 Nos. Fish Landing Station/Fish Markets
Organization: Department of Fisheries
Procuring Entity: Office of Project Director Sustainable Costral and Marine Fisheries Project
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2023-10-04 10:00:00
Document last selling: 2023-11-08 16:00:00
Closing / Opening: 2023-11-09 11:00:00
Brief Description of Package: Upgrading and Modernization of Existing 10 Nos. Fish Landing Stations/Fish Markets including Access Road, RCC Jetty
Upgrading and Modernization of Existing 6 Nos. Fish Landing Station at
1. Shamlapur Matshya Landing Center, Teknaf, Cox’s Bazar
2. Chonua Farir Mukh, Bashkhali, Chattogram
3. Tulatuli Landing Center, Sadar, Bhola
4. Patarkhal, 1 No Mach Ghat, Doulatkhan, Bhola
5. Kashemgonj Bazar Matshya Ghat, Lalmohon, Bhola
6. Central khal Machghat, Ramgoti, Laxmipur
Upgrading and Modernization of Existing 4 Nos. Fish Markets at
1. Al-haz Kabir Chowdhury Machbazar, Pekua, Cox’s Bazar
2. Patarkhal, 1 No Mach Ghat Bazar, Doulatkhan, Bhola
3. Alexander Mach Bazar, Ramgoti, Laxmipur
4. Rajour Matshya Arot, Sarankhola, Bagerhat
Tender Document Price: Tk. 4000;
Tender Security: 20000000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 666666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 2000000000 BDT.
Thus, Official Cost Estimate should be BDT. 666666666 ~ 2000000000.
Eligibility criteria:
1. The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 5 years (years counting backward from the date of publication of IFT in the e-GP system)
2. The Minimum Specific Experience as a Prime Contractor or Sub Contractor or management contractor in construction works of maximum 03 (Three) contract(s) of Similar nature, complexity and methods/construction technology (Building Construction Work and others RCC structures with pile) within the last 05 years, combine value of the total works at least Taka. 54.00 (Fifty-Four) Crore. Years counting backward from the date of publication of IFT in the e-GP system.
3. The required average annual construction turnover shall be greater than Taka 90 (Ninety) Crore over the best three (3) years in the last five (5) years (years counting backward from the date of publication of IFT in the e-GP system).
4. The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Taka 26.00 (Twenty-Six) Crore
5. The minimum capacity shall be: Taka 58.00 (Fifty-Eight) Crore
Project: Sustainable Coastal and Marine Fisheries Project
Location of work / delivery: Chattogram Coxs Bazar Bhola Laxmipur Bagerhat
Budget Type: Development
Category: Works for complete or part construction and civil engineering work; Construction work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works
PE Address: Project Director,
Sustainable Costral and Marine Fisheries Project,
Matshya Bhaban Ramna, Dhaka,
Room No-1010, 10th Floor.
, City: Dhaka, Thana: Dhaka, District: Dhaka - 1000, Country: Bangladesh,