Login |Register

LTM tenders of Satkhira district. | OSTETM tenders of Satkhira zilla. | OTM tenders of Satkhira. | View All the active tenders of Satkhira district.

eGP Tender ID: 921581; Works (NCT)
APP ID: 200202; District: Satkhira
Reference No.: T-3/1483, Dt. 11-12-2023.
Package Title: Repair of protection work from Km. 0.350 to km 0.720 = 370.00 m & from Km. 0.885 to km 1.125 = 240.00 m total = 610.00m in Polder No-14/1 under "Rehabilitation of Polder No-14/1 in Khulna District" under Satkhira O&M Division-2, BWDB, Satkhira.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Satkhira O&M Division-2
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2023-12-11 13:01:00
Document last selling: 2024-01-07 18:00:00
Closing / Opening: 2024-01-08 15:30:00
Brief Description of Package: Sat-2/38 

Repair of protective work from Km. 0.350 to km 0.720 = 370.00 m & from Km. 0.885 to km 1.125 = 240.00 m total = 610.00m in Polder No-14/1 under "Rehabilitation of Polder No-14/1 in Khulna District" under Satkhira O&M Division-2, BWDB, Satkhira.
Tender Document Price: Tk. 4000; Tender Security: 13000000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 433333333.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 1300000000 BDT.
Thus, Official Cost Estimate should be BDT. 433333333 ~ 1300000000.

Eligibility criteria:
All the egp enlisted contractor satisfying the criteria mentioned in e-PW3 document attached herewith as per PPA-2006 and latest PPR-2008. The following conditions are applicable:
1. Payment of work will be made on availability of budget & fund release. No extra claim/ interest for delaying in payment will be entertained. R/A bill will be entertained on the availability of budget and fund. But work progress will not be hampered for lack of fund release/ want of R/A Bill.
2. Latest Technical specification for civil work of BWDB will govern provided in particular specifications.
3. If any type of Structures/Obstacles is needed to dismantle to execute the work as per Design & Specification, the selected Contractor will do this at his own cost & arrangement. No Extra claim will be entertained in this regard.
4. Representative still picture & video of prework & postwork of the same location will be taken by contractor and submit to Procuring entity at contractor's owncost.
5. Quantity of work may extremely increase or decrease.
6. Design may also be changed or modified (if required).
7. Prework & Postwork may be also taken by taskforce or other agency or jointly as per instruction of Higher Authority or PE
8. Cost of Interim and post-work survey will be borne by the contractor. No extra claim will be entertained.
9. After completion of the Whole work final Measurement will be Taken. The final bill will be paid based on the final measurement
10. Contract will be terminated if contractor's personnel is involved in any kind of unauthorized/illegal financial transaction from the locals during eviction work.
 
Project: Rehabilitation of Polder no.14/1 in Khulna District
Location of work / delivery: Koyra, Khulna
Budget Type: Development
Category: Engineering works and construction works; Works for complete or part construction and civil engineering work;
PE Address: Itagachha, Satkhira, City: Satkhira, Thana: Satkhira Sadar, District: Satkhira - 9400, Country: Bangladesh,


See more tenders from Satkhira O&M Division-2; Bangladesh Water Development Board (BWDB):
1025550 : Sat-2/38 Repair of protection work from Km. 0.350 to km 0.720 = 370.00 m & from Km. 0.885 to km 1.125 = 240.00 m total = 610.00m in Polder No-14/1 under "Rehabilitation of Polder No-14/1 in Khulna District" under Satkhira O&M Division-2, BWDB, Satkhira.
1025549 : Sat-2/09 River bank protection work from km 3.710 to km 4.145=435.00 meter in polder No-14/1 under Rehabilitation of polder No-14/1 in khulna District under Satkhira O&M Division-2, BWDB, Satkhira.
1025548 : Sat-2/08 River bank protection work from km 3.275 to km 3.710=435.00 meter in polder No-14/1 under Rehabilitation of polder No-14/1 in khulna District under Satkhira O&M Division-2, BWDB, Satkhira.
1025547 : Sat-2/06 River bank protection work from km 1.125 to km 1.575=450.00 meter in polder No-14/1 under Rehabilitation of polder No-14/1 in khulna District under Satkhira O&M Division-2, BWDB, Satkhira.
976772 : W-Sat-2/53 Re-Excavation of Morichap River from km. 29.365 to km. 30.500 = 1135 meter in Polder No-2 at Assasuni Upazilla in c/w "Drainage Improvement of Polder No. 1, 2, 6-8 & 6-8 (Ext.) in Satkhira District" Under Satkhira O&M Division-2, BWDB, Satkhira during the FY 2023-2024.
Share on Twitter